Skip to content

Phase 1 Navigation

InfraLynx Phase 1 navigation must expose only surfaces that are implemented and usable.

Core

  • Tenants
  • Users

DCIM

  • Sites
  • Racks
  • Devices

IPAM

  • VRFs
  • Prefixes
  • IP Addresses

Network

  • Interfaces
  • Connections

Operations

  • Jobs

Rules

  • Do not expose advanced domains before the underlying workflows are usable.
  • Do not mirror the full target product navigation early.
  • Keep route naming resource-oriented and stable.
  • Keep breadcrumb structure aligned to the sidebar hierarchy.

Why This Phase Exists

The earlier shell proved out navigation, search, rack visualization, topology, and IPAM views. Phase 1 changes the shell from a capability demo into a usable operator workspace by making navigation track actual CRUD surfaces and currently available operational pages.